PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Door frames at the 3rd floor Facing West.jpg Instaling waste and vent piping at the 3rd floor Facing North.jpg Installed electrical wiring at the 2nd floor door frames 1.jpg Installed electrical wiring at the 2nd floor door frames 2.jpg Installing concrete planks at the 1st floor detention cells defdfggdfmvmm vnnxm.jpg Installing metal framing at the 3rd floor Facing North-East.jpg Installing storm piping at the 4th floor Facing East.jpg Installing Storm piping at the High Roof Facing West.jpg Interior metal Framing at the 3rd floor Waiting Area Facing North-West.jpg
Previous pageNext page Installing concrete planks at the 1st floor detention cells defdfggdfmvmm vnnxm
Installing concrete planks at the 1st floor detention cells defdfggdfmvmm vnnxm